ADVANTAGES:
1.No additional facility required
2.No need to change network topology
DISADVANTAGES:
1.Occupies switch port
2.Possible influence to network transmission performance when meeting huge traffic
ATX Case with Power Supply
AMD Central Processing Unit with Factory CPU Fan and Heatsink
Motherboard with Video/Sound/LAN
256Mb RAM
40Gb Western Digital Hard Drive
3.5 Floppy Drive
56x CD-ROM
v.90 56K Modem
Keyboard
Mouse
Speakers
Upgrades Available
RAM
Hard Drives
CD RW
DVD P
layer combo CD
Burner
17" Flat Scr
een LCD
17” Color Monitor
No Operating System installed, but Windows XP Home Edition can be installed for ONLY $159.99 MORE!! In store Oper
ating System
sale price $199.99 to $216.00
Have your Operating
System Installed for $65.00
MONITOR:
Features:
a) Horizontal scanning frequenc y: 30 - 75kHz
b) Field frequency: 50 - 140Hz
c) Video bandwidth: 130MHz
d) Highest resolution: 1,60 0 x 1,200 ()
e) Adjusting sy stem: digital microprocessor OSD adjusting system
f) System compatibility: VESA, IBMPC, PC / XT, PC / AT
g) Power: AC100 ~ 240V, 60 / 50Hz
Packing: standard export packaging If you would like more information about CRT C
omputer Monitor, please contact us or visit our website for more details.
SWITCH:
front view
back view

The Net Integrator package should contain the following items:
Wait two or three minutes as the Net Integrator auto configures an IP address. You now have three options:
The star topology reduces the chance of network failure by connecting all of the systems to a central node. When applied to a bus-based network, this central hub rebroadcasts all transmissions received from any peripheral node to all peripheral nodes on the network, sometimes including the originating node. All peripheral nodes may thus communicate with all others by transmitting to, and receiving from, the central node only. The failure of a transmission line linking any peripheral node to the central node will result in the isolation of that peripheral node from all others, but the rest of the systems will be unaffected.

Passing of Data Packet through unnecessary nodes is prevented by this topology. At most 3 devices and 2 links are involved in any communication between any two devices which are part of this topology. This topology induces a huge overhead on the central hub, however if the central hub has adequate capacity, then very high network utilization by one device in the network does not affect the other devices in the network.
Telecommunications Closet
Telecommunication closet will be located near the center of the CICT bulding.Also known as wiring closet.One on each floor (typically, depending on the floor space and special requirements number may vary).Standards complaint connecting hardware should be used.Specifications about short cables (patch chords) are made.In large office buildings, there will be centralized equipment rooms to house servers, hubs, modems etc.It is the central interconnection point for network cabling.Main cross connections are specified here.
